Ahmedabad/Mumbai, April 11 (IANS) The assembly of the second Tunnel Boring Machine (TBM) for the Mumbai-Ahmedabad High Speed Rail corridor has commenced at Savali near Ghansoli, marking a key phase in the development of the underground section of India’s first bullet train project. The machine is being assembled approximately 39 metres below ground level at the Savali shaft, from where it will be deployed to drive tunnels towards Vikhroli as part of the Mumbai-Ahmedabad Bullet Train corrido…
Trending
- Dastaar Movie Review: Tarsem Jassar’s Powerful Sikh Resilience Drama
- Diamond Made Man Part 2 Review: A Cosmic Sci-Fi Spectacle That Soars
- ‘Oka Court Case’ 2026 Movie Review: A Fresh Legal Love Drama That Wins Hearts
- Rahun Main Tere Rubaru Review: A Gripping Tale of Love, Danger & Deception
- ‘Vadala’ Movie Review: A Gripping Psychological Thriller With Powerhouse Performances
- Oh! Sukumari Movie Review: Thiruveer, Aishwarya Rajesh Spark Pure Magic in This Rural Entertainer
- MRP (Neekentha Naakentha) Movie Review: A Hilarious Corpse-Swap Comedy You Can’t Miss
- Arulvaan Movie Review: Arulnithi’s Powerful Drama Is a Heartfelt Ode to Education
