Latest Plant Load Factor News & Updates

Chennai, March 19 (IANS) Tamil Nadu is preparing to meet a surge in electricity demand as temperatures climb across the state, with power authorities planning to maximise output from coal-based thermal plants in the coming days.The move is aimed at ensuring uninterrupted supply during the peak summer period, when consumption typically rises sharply.The state’s thermal power generation network, with an installed capacity of 5,120 MW, includes major plants in North Chennai, Mettur and Thoothukud…

New Delhi, Feb 9 (IANS) The Ministry of Power has envisaged to set up an additional minimum 97,000 MW coal and lignite-based thermal power generation capacity in the country to meet the projected electricity demand of the country, the Centre told the Parliament on Monday. According to studies carried out by the Central Electricity Authority (CEA), the projected thermal (coal and lignite) capacity requirement by the year 2034–35 is estimated at nearly 3,07,000 MW as against the 2,11,855 MW inst…