Close Menu
  • Indian Festivals 2026
  • Movie & OTT Releases This Week
  • News
  • Entertainment
  • NRI Life
  • Research
  • Advertise with us
Facebook X (Twitter) Instagram YouTube
  • Download Indian Community App
  • Advertise Here
Facebook X (Twitter) Instagram
Indian CommunityIndian Community
Trending
  • Adhey Neevu Adhey Nenu 2026 Movie Review: A Love Triangle That Hides a Deadly Secret
  • Hanuman Ansh 2026 Movie Review: A Soul-Stirring Tribute That Will Move You to Tears
  • Karmakhya 2026 Movie Review: Samuthirakani’s Brilliant Performance Powers This Thriller
  • Srinivasa Mangapuram Movie Review: 5 Reasons This Heartfelt Telugu Romance Is a Must-Watch Emotional Ride
  • Bhai Tera Star Hai (2026) Movie Review: Raghav Juyal Powers a Riotous London Caper
  • Spider-Man: Brand New Day 2026 Review: Tom Holland’s Heartbreaking Transformation Will Shatter You
  • The Bose Files: Sach Ya Sazish Movie Review: 4 Powerful Reasons This Gripping Netaji Drama Deserves a Watch
  • Adarsh Baal Vidyalaya Review: A Heartwarming Triumph on India’s Education System
  • Indian Festivals 2026
  • News
    • National
    • International
    • Entertainment
    • Achievements
    • Scam Alerts
    • Business
    • Health & Medicine
    • Science & Technology
    • Sports
  • Entertainment
  • Latest Movie Releases
    • Latest OTT Releases
  • NRI Life
  • India & Culture
  • Health & Wellness
  • Research
Indian CommunityIndian Community
Home » News » National
National

Vadodara bullet train station takes shape as slab casting done, steel erection underway

Indian Community Editorial TeamBy Indian Community Editorial TeamAugust 4, 20262 Mins ReadNo Comments Add us to Google Preferred Sources
Vadodara bullet train station takes shape as slab casting done, steel erection underway
Share
Facebook Twitter LinkedIn Pinterest Email

Vadodara, Aug 4 (IANS) Construction of the Vadodara Bullet Train station has reached another milestone, with slab casting at the concourse, track and platform levels completed and structural steel erection now underway, according to the latest project update.

The station is being built near Vadodara Railway Station, close to Pandya Bridge, as part of the Mumbai-Ahmedabad High-Speed Rail corridor.

It has been designed to provide better connectivity between the bullet train network and the railways by being constructed above the existing Platform No. 7 of Vadodara Railway Station.

The integrated layout is intended to allow passengers to transfer directly between conventional rail services and high-speed trains.

The National High Speed Rail Corporation Limited (NHSRCL) said the station’s location will also offer multimodal connectivity with the Western Railway station as well as the city’s local and interstate bus depots, allowing easier access for passengers using different modes of transport.

The architectural design of the station draws inspiration from the banyan (Vat) tree, from which the city derives its name.

Its interiors have been planned to maximise natural daylight while providing views of the open sky in passenger areas.

Once completed, the station will include waiting lounges, a baby care room, restrooms and retail outlets. Separate parking facilities and designated pick-up and drop-off areas have also been planned for cars, buses and auto-rickshaws to improve passenger movement.

The latest construction update states that slab casting for the concourse, track and platform levels has been completed, while structural steel erection is progressing on site.

The work forms part of the broader station superstructure before architectural finishing and installation of passenger facilities.

Vadodara is one of the 12 stations planned along the 508-kilometre Mumbai-Ahmedabad High-Speed Rail corridor, India’s first bullet train project.

The corridor will connect Mumbai in Maharashtra with Ahmedabad in Gujarat through a dedicated high-speed rail network.

Recent works across the project have included station construction, bridge launches, viaduct development and track infrastructure at multiple locations in Gujarat and Maharashtra as construction advances on the corridor.

–IANS

mys/dpb

Add us to Google Preferred Sources
Indian Community Editorial Team

The Indian Community Editorial Team curates, verifies, and publishes stories that matter to Indians worldwide. From culture and community to business and innovation, our mission is to spotlight voices, ideas, and events that bring our global community closer together. Have news or a story to share? Submit it to us at [email protected].

Add A Comment

India U31 team wins bronze at World Youth Bridge Championships

August 5, 2026

J&K Open 2026: Khalin Joshi opens commanding seven-shot lead at halfway stage

August 5, 2026

Manikandan's next film titled 'Makkal Kaavalan'

August 5, 2026

Shreya Kalra lifts the trophy for 'Lock Upp 2', Shivangi Joshi becomes the 1st runner up

August 5, 2026
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
About Us
  • About Us
  • Contact Us
  • Terms of Service
Corporate
  • Download Indian Community App
  • Advertise Here
Facebook X (Twitter) Instagram
  • About Us
  • Contact Us
  • Terms of Service
© 2026 Designed by CreativeMerchants.

Type above and press Enter to search. Press Esc to cancel.