Close Menu
  • Indian Festivals 2026
  • Movie & OTT Releases This Week
  • News
  • Entertainment
  • NRI Life
  • Research
  • Advertise with us
Facebook X (Twitter) Instagram YouTube
  • Download Indian Community App
  • Advertise Here
Facebook X (Twitter) Instagram
Indian CommunityIndian Community
Trending
  • Operation Safed Sagar Review 2026: A Powerful Tribute To Kargil’s Air Warriors
  • DC Movie Review 2026: Wamiqa Gabbi’s Fierce Performance Make This Saga a Massive Triumph
  • Korean Kanakaraju Movie Review 2026: An Unmissable Cross-Border Ride
  • Ohh My Dog Movie Review 2026: A Heartwarming Triumph Of Loyalty & Love
  • G.D.N. Movie Review: Madhavan’s Powerhouse Biopic Is a Tribute to India’s Forgotten Edison
  • Adhey Neevu Adhey Nenu 2026 Movie Review: A Love Triangle That Hides a Deadly Secret
  • Hanuman Ansh 2026 Movie Review: A Soul-Stirring Tribute That Will Move You to Tears
  • Karmakhya 2026 Movie Review: Samuthirakani’s Brilliant Performance Powers This Thriller
  • Indian Festivals 2026
  • News
    • National
    • International
    • Entertainment
    • Achievements
    • Scam Alerts
    • Business
    • Health & Medicine
    • Science & Technology
    • Sports
  • Entertainment
  • Latest Movie Releases
    • Latest OTT Releases
  • NRI Life
  • India & Culture
  • Health & Wellness
  • Research
Indian CommunityIndian Community
Home » News » National
National

Uttarakhand govt suspends PWD engineers over damaged bridge approach road

Indian Community Editorial TeamBy Indian Community Editorial TeamAugust 7, 20262 Mins ReadNo Comments Add us to Google Preferred Sources
Uttarakhand govt suspends PWD engineers over damaged bridge approach road
Share
Facebook Twitter LinkedIn Pinterest Email

Dehradun, Aug 7 (IANS) The Uttarakhand government has suspended three Public Works Department (PWD) engineers and ordered immediate action against design consultants after the approach road of a newly constructed bridge on the Tons River was damaged.

The incident involved the bridge at “Nanda Ki Chauki” on the old Dehradun‑Paonta Sahib National Highway. A preliminary inquiry found that heavy upstream scouring created a cavity, damaging the approach road. The inquiry attributed the problem primarily to the design consultant, who failed to provide the required design of river diversion work and did not recommend river training measures despite the river bed’s cross slope and meandering nature. As a result, the river flow concentrated on one span, causing scouring.

Secretary, Uttarakhand Government, Pankaj Kumar Pandey, issued directions on August 7, 2026, to the Chief Engineer, PWD, Dehradun. Referring to the preliminary inquiry report submitted by the Chief Engineer, Regional Office, he fixed responsibility on the design consultant and proof‑checking consultant.

He directed immediate action against them and asked for a time‑bound action plan, based on the protective measures suggested in the inquiry report, to safeguard the bridge in the future.

Separately, office orders issued the same day suspended three officers who were overseeing the work. Executive Engineer Rajesh Kumar of the provincial division, PWD, Dehradun, was suspended with immediate effect. The order stated that he failed to ensure technical supervision, quality control, compliance with contractual conditions and proper discharge of duties. This was described as gross negligence and serious dereliction of duty that tarnished the government’s image and affected public interest.

Assistant Engineer Amit Tyagi and Junior Engineer Naveen Gairola of the same division were also suspended on identical grounds. Both were held responsible for failing to maintain technical oversight, enforce quality control, ensure contractual compliance and report critical technical deficiencies to higher officers.

All three officers will remain attached to the office of the Chief Engineer, PWD, Dehradun, during suspension. They will receive subsistence allowance as per rules and cannot leave headquarters without prior permission.

The suspensions have been ordered under the Uttarakhand Government Servants (Discipline and Appeal) Rules, 2003, as the case is serious in nature and may attract major penalties. The government has stressed the need for swift corrective measures to protect the structure and prevent further damage.

–IANS

sktr/dan

Add us to Google Preferred Sources
Indian Community Editorial Team

The Indian Community Editorial Team curates, verifies, and publishes stories that matter to Indians worldwide. From culture and community to business and innovation, our mission is to spotlight voices, ideas, and events that bring our global community closer together. Have news or a story to share? Submit it to us at [email protected].

Add A Comment

Sunny Deol meets UP CM Yogi Adityanath

August 7, 2026

Jr Boys' NFC: Dr BC Roy Trophy to kick off in Bengaluru, Narainpur on August 25

August 7, 2026

Cop deployed outside Salman Khan’s house collapses, dies

August 7, 2026

Football: Ex-Getafe defender Duarte joins Sao Paulo on free transfer

August 7, 2026
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
About Us
  • About Us
  • Contact Us
  • Terms of Service
Corporate
  • Download Indian Community App
  • Advertise Here
Facebook X (Twitter) Instagram
  • About Us
  • Contact Us
  • Terms of Service
© 2026 Designed by CreativeMerchants.

Type above and press Enter to search. Press Esc to cancel.